onsdag 30 december 2009

Floor foundation

For the last couple of days we have managed to fix the floor foundation, electricity and water connections.
We started by taking down the wall between the kitchen and the dining room:

From Köksrenovering

From Köksrenovering


We will put up a brick wall on the left from floor to ceiling and a half height brick wall plus cabinets on the right (seen from the kitchen to the dining room):
From Köksrenovering


Happy dad:
From Köksrenovering


Floor foundation:
From Köksrenovering


From Köksrenovering


Electricity time:
From Köksrenovering


Three days of fun:
From Köksrenovering

söndag 6 december 2009

Sunday cleanup done

Some more things removed and the floor is now cleaned up (notice the dust in the air):
From Köksrenovering

From Köksrenovering


Our temporary kitchen:
From Köksrenovering

lördag 5 december 2009

The kitchen floor is no more

Today we ripped out the old kitchen and the floor.

It has begun:

From Köksrenovering


No more cabinets:
From Köksrenovering

From Köksrenovering


A mother load of kitchenthingies:
From Köksrenovering


One generation at the time should be worn out:
From Köksrenovering


Some Sunday entertainment left:
From Köksrenovering